Electrical Requirements (Models Without Power Cord) - Bunn Dual TF DBC Installation And Operating Manual

With smart funnel
Hide thumbs Also See for Dual TF DBC:
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS (Models without power cord)

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L1 BLACK
L2 RED
GREEN
200 and 230 volt ac
single phase, 60 Hz models
Note: This electrical service
consists of 2 current carrying
conductors (L1 and L2) and a
separate conductor for earth
ground.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
WHI
N
BLK
L1
200 or
230V
RED
L2
BLU
L3
GREEN
GREEN
120/208 and 120/240 volt ac
three phase, 50 Hz models
Note: This electrical service
consists of 4 current carrying
conductors (Neutral, L1, L2
and L3) and a separate con-
ductor for earth ground.
SYSTEM
VOLTAGE
208
240
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2
phases.
V2 = Phase to neutral voltage, L1 to neutral
must be 120V.
CAUTION: Do not connect L1 to a cir-
cuit operating at more than 150 volts to
ground.
GREEN
V1
V2
208
120
240
120
Page 5
BLU
N
BRN
L3
RED
L2
BLK
L1
GREEN
400/230V ac
3 phase models
Note: This electrical service
consists of 4 current carrying
conductors (Neutral, L1, L2
and L3) and a separate con-
ductor for earth ground.
SYSTEM
VOLTAGE
V1
400/230
400
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between
any 2 phases.
V2 = Phase to neutral voltage, between
neutral and any phase.
GREEN
V2
230
35058.1 042007

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents