Table Of Contents - Bunn CWA-APS Operating & Service Manual

Cwa-aps, cwa-ts, cwta-aps, cwta-ts operating & service manual
Hide thumbs Also See for CWA-APS:
Table of Contents

Advertisement

SERVICE
This section provides procedures for testing and
replacing various major components used in this
brewer should service become necessary. Refer to
Troubleshooting for assistance in determining the
cause of any problem.
WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified
service personnel. The brewer should be unplugged
when servicing, except when electrical tests are re-
quired and the test procedure specifically states to
plug in the brewer.
COMPONENT ACCESS
WARNING - Disconnect the brewer from the power
source before the removal of any panel or the replace-
ment of any component.
All components are accessible by the removal of
the top cover and front inspection panel.
The top cover is attached with one #4-40 screw.
The front inspection panel is attached with six #6-
32 screws on APS and TS Models.
Contents
Control Thermostat ............................................. 14
Limit Thermostat ................................................ 15
ON/OFF Switch.................................................... 16
Solenoid (Inlet) ................................................... 17
Start Switch (Brew) ............................................ 18
Tank Heater ........................................................ 19
Tank Heater Switch ............................................. 20
Timer (Early Model) ............................................ 21
Digital Timer (Late Models) ................................ 22
Wiring Diagrams ................................................. 25
FIG. 1 COMPONENT ACCESS
Page 13
CWA-APS
CWTA-TS
P1467
10690.1 063000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

TsCwa-tsCwta-apsCwta-tsCwa-atsCwta-ats

Table of Contents