Operation; Before You Begin; Power On - Seagate OneStor SP-3584 Installation & User Manual

Table of Contents

Advertisement

Chapter 4

Operation

4.1 Before You Begin

Before you power up the enclosure make sure that all the modules are firmly seated in their correct bays.

4.2 Power On

Caution
Do not operate the enclosure system until the ambient temperature is within the specified operating range
(see section
make sure they have had time to adjust to the environmental conditions.
Connect the power cables to the PSU(s) – see
1
Move all PSU power switches to the "on" position.
2
The system power LED on the ops panel should be lit green and the disk drive motors should start.
3
Important
If mains power is lost for any reason, the system will re-start automatically when power is
restored.
Note
See section
conditions.
Care should be taken when turning on/off PSUs. The following points should be considered when
turning PSUs on/off.
• Remove the AC cord before inserting or removing a PSU.
• Turn off the PSU switch before inserting or removing the AC cord.
A.5, "Temperature and Humidity", on page
4.3, "Ops Panel LEDs", on page 30
58). If the drives have been recently installed,
Figure
4–1.
for details of the ops panel LEDs and related fault
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents