Follow all applicable federal, state, local and industry specific regulations. McElroy cannot NOTICE: Turn machine off, disconnect machine power, and remove the facer blades before anticipate every possible circumstance that might involve a potential hazard.
Page 3
INSPECT, CLEAN & INSTALL PREPARE PIPE HEATER • Review FUSING parameters. • INSPECT machine and pipe. • Ensure the pipe does not slip through the jaws at • Review HEAT SOAK time, BEAD SIZE, OPEN/CLOSE time, and COOLING time. FUSING force. •...
Page 4
OPEN HEATER JAWS & REMOVAL INSPECT & PIPE FUSION INSPECTION INCORRECT INCORRECT CORRECT • When appropriate bead size • Disengage the LOCKING CAM. is observed, open the carriage and REMOVE the heater. • Loosen the jaws, open the carriage, and INSPECT the fusion. •...