ATESS HPS50 User Manual

ATESS HPS50 User Manual

Hybrid energy system
Hide thumbs Also See for HPS50:

Advertisement

HPS50
Hybrid energy system User Manual
Shenzhen Growatt Power Technology Co.,Ltd
1st Floor of Building 3 at Sector B and 3rd Floor of Building 9,
Henglong Industrial Park, No.4 Industrial Zone, Shuitian
Community, Shiyan Street, Baoan District, Shenzhen
T: +86 755 2998 8492
F: +86 755 2998 5623
E: info@atesspower.com
W: www.atessp.com
044.ZT00007-00

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HPS50 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ATESS HPS50

  • Page 1 HPS50 Hybrid energy system User Manual Shenzhen Growatt Power Technology Co.,Ltd 1st Floor of Building 3 at Sector B and 3rd Floor of Building 9, Henglong Industrial Park, No.4 Industrial Zone, Shuitian Community, Shiyan Street, Baoan District, Shenzhen T: +86 755 2998 8492 F: +86 755 2998 5623 E: info@atesspower.com...
  • Page 2: Table Of Contents

    3.2 Circuit diagram of the inverter Routine maintenance 7.1 Regular maintenance 3.3 The layout of the main components 7.2 Waste disposal 3.4 Operation mode 3.5 Battery setting 3.6 Protection Appendix 3.7 Storage 3.8 Dimension 8.1 Specification 3.9 Packaging information 8.2 ATESS Factory warranty 8.3 Contact...
  • Page 3: About This Manual

    1.3. How to use this Manual safety instruction Read this manual before installation of the ATESS HPS50. Store this manual where accessible at all times. Attention that needs to be paid when operating and maintaining ATESS HPS50. The contents of this manual will be periodically updated or revised if necessary.
  • Page 4 Proper installation requires following all the instructions in the user manual Electrical shock danger exists in the capacitor; the cover shall involving transportation, mounting, wiring and commissioning. ATESS does not WARNING be moved at least 5 minutes later after all powers are cover warranty for the inverter damage due to failing to use it properly.
  • Page 5: Operator

    Don't change the parameters of the inverter without authorization from the local Transportation should follow the transportation methods described in the user utility and ATESS Energy Technology Co., Ltd. Otherwise, it might lead to injury or manual. The inverter's weight and center of gravity should be taken into account equipment damage and the warranty of the inverter will be voided.
  • Page 6: Important Note

    3.1 Energy Storage system Electromagnetic emission impact on the environment ATESS HPS50 bidirectional battery inverter is designed for energy storage system, it converts DC current generated by battery bank into AC current and feed Inverter may generate some noise and electromagnetic radiation during it into the load/grid, also it can take power from solar inverter or grid to charge operation.
  • Page 7: The Layout Of The Main Components

    Indicator There are two LED indicators on the inverter which is used to display the current 3.3.1 External components status of the inverter. ATESS HPS30 appearance of the structure as shown in FIG. 3-3-1-1 Figure 3-3-1-2 LED indicators Description POWER The indicator lights when power supply to the inverter is normal.
  • Page 8: Operation Mode

    Output power is limited under 50% of load power. HPS50 connected to battery ,PV on the DC side, and grid,load on the AC side; b. When PV power is supply priority to battery, micro-grid charge battery.
  • Page 9: Battery Setting

    > The packaging should be restored to its original state; > Retain the desiccant in the packaging. > The ATESS HPS50 can only be stored when it is stopped and all the doors are closed in a dry room to protect the internal circuits against dust and moisture.
  • Page 10: Installation Condition Requirements

    Products installation In front of the installation place of inverter, a space of 1.5m or more shall be ensured, the back 0.6m or more, the top 0.6m or more to ensure easy installation, cooling and maintenance. 4.1 Installation condition requirements [Cable trench] To ensure normal operation of the machine, the installation environment is required as follows:...
  • Page 11: Tools And Spare Parts Required For Whole Machine Installation

    Any fault attributed to modification unauthorized by ·Another fan can be added at the air duct outlet to exhaust the air out and ensure the ATESS is beyond the quality assurance. balanced pressure; Note 2: In movement, tilt, violent shake or sudden force upon the inverter shall be ·The direction of the air outlet shall be selected according to the local actual wind...
  • Page 12 Sign Indication Face up to prohibit the inverter horizontally, tilted or upside down Handle with care, to avoid the transport environment too intense collision friction damage to the inverter Keep away from moisture Figure 4-3-2-1 [Movement and installation of bear machine] Inverters whose packages are not demolished can be moved with forklift, hoisting crane or crane.
  • Page 13 7)Connect the port C marked at "AC-output" of HPS50 with "L3" of the load . 8) Connect "N" of the load and "N" of the grid with the "N" port of HPS50 The inverter of ATESS PCS series has various communication methods. When the...
  • Page 14: Electrical Installation

    2) Determine the positive and negative with a multimeter. conditions. The following is the grid limit for satisfaction of local Grid connected 3) Connect the positive of the battery to the "Battery-input +"of The HPS50 Conditions (requirements in different countries may vary, the value can be setup 4) Connect the negative of the battery to the "Battery-input +"of The HPS50...
  • Page 15: Communication

    RS485/RS232 adaptor. Inside the PC, a multi-machine monitoring working men or more shall inspect to ensure correct installation of all installation software ShineNet independently developed by the ATESS is monitoring in real according to the following table. time the operating status of all inverters, as shown in Figure 4-5-1. The RS485 wire should be less than 1000m.
  • Page 16: Relevant Requirements

    If possible, measure the phase THD (Total Harmonic Distortion), and inspect the curve. If distortion is serious, the inverter may fail to operate. When connecting the load,make sure that the three-phase of the load is corresponding to the three-phase of the HPS50,otherwise it will cause the motor to reverse. CAUTION!
  • Page 17: Power On Steps

    By now, the pilot operation of inverter is fully completed, and we can enter the daily operational maintenance. Ensure that the battery voltage is within the limits set by the HPS50,and the battery ratio of the HPS50 is correct. 5.3 Power on steps 5.5 Power off steps...
  • Page 18: Lcd Display Screen Introduction

    Disharge 20Years Generation Table 6-1 ATESS HPS50 LCD Menu After powering on the LCD,it will enter the home page. Then you can begin to read the information and set the parameters. Inverter communication state, station number and system time is displayed at the top of each page of the LCD.
  • Page 19 Device Information: This page shows the manufacturer, inverter serial number, hardware and software version information, and the date of manufacturing. Language Settings: Select language, currently it only supports Chinese, English (default language is Chinese). Maintenance: the interface requires a password to login. It is for electrician and maintenance personnel who are fully familiar with the structure and working principle of the DC grid system only, in order to avoid damage to personal safety and the inverter.
  • Page 20: Lcd Display Information Schedule

    6.3 LCD display information schedule 6.3.1 General history failure table information DC_Inverse_Failure IGBT_Failure EEPROM_Write_Failure EEPROM_Read_Failure AC_MainContactor_Failure AC_SlaveContactor_Failure RISO_Failure 6.2.5 Operation data DC_VoltHigh_Fault DC_CurrHigh_Fault Clicking the “Operation data” in any interface will enter into the submenu of DC_OCP_Fault “operation data”. INT_DC_OverVolt_Fault The sub-menu includes: real-time data, the power curve, and energy yield figure.
  • Page 21: Regular Maintenance

    information Routine maintenance Module_OverTemp_Fault Inductor_OverTemp_Fault Transformer_OverTemp_Fault 7.1 Regular maintenance LowTemp_Fault EPO_Stop KeyEmergencyStop In order to ensure the normal operation of the inverter, regular maintenance work is required. LcdEmergencyStop Recommended routine maintenance cycle and work, as shown in Table 7-1. AC_MainContactor_Fault AC_SlaveContactor_Fault Table 7-1 Routine maintenance work AC_SPD_Fault...
  • Page 22: Specification

    BAT input operating voltage range 350V-600V( MPP voltage-100V agreed to it in writing signed and approved by ATESS , ATESS shall have no responsibility or liability whatsoever for damage or injury to persons or property, or BAT Maximum operating DC input current...
  • Page 23: Contact

    The warranty shall also cease to apply if the product cannot be correctly identified as the product of ATESS. Warranty claims will not be honored if the type of serial number on the inverters have been altered, removed or rendered illegible.