O 110 mm 30 kgf, o 125 mm 36 kgf, 42 kgf, o 150 mm 57 kgf, o 185 mm 65 kgf, 76 kgf, o 150 mm 57 kgf, o 185 mm 65 kgf, 76 kgf, 90 kgf 110 kgf, 130 kgf, o 250 mm 150 kgf (104 pages)
....Raadpleeg het 'Onderhouds- en garantie- Consult the ‘Maintenance and Warranty Zur Wartung vgl. das „Wartungs- und Ga- boek' voor Onderhoud. Book’ for Maintenance. rantiebuch“. vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
Make sure that the user of the vessel is supplied with the owner’s manual. vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
We do not advise fitting 2 bow thrusters into one tunnel; this does ways well clear from the maximum bilge water level. not result in doubling the thrust! vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
- The bars must be installed so they are perpendicular to the ex- pected waveform. vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
NOTE: The gaskets supplied are al- required. ready electrically insulated. However the bolts and the shaft need to be fit- ted with insulation material, for exam- ple nylon bushes. vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
Instead of a storage battery main switch, a remotely controlled main switch annex emergency stop can be installed. This remotely controlled main switch is available for 12 or 24 Volt DC. Vetus art. code: BPMAIN12 respectively BPMAIN24. vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
This fuse protects the on-board power cabling from short circuits. For all fuses we can suppy a fuse holder, Vetus part no.: ZEHC100. See page for the size of the fuse to be used.
4 min. continuously or max. 4 min. per hour at 375 A (12 Volt). See table on page107 4 min. continuously or max. 4 min. per hour at 205 A (24 Volt) vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
2 x 55 Ah - 12 V 2 x 70 Ah - 12 V 0 - 73 ft AWG 2 2 x BCI 90 - 500 2 x BCI 91 - 650 vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
Jednoczesna obsługa dwóch pędników dziobowych przy użyciu jednego panelu Comando contemporaneo di 2 eliche di prua mediante 1 solo pannello (12 V (12 V / 24 V) / 24 V) vetus® Operation manual and installation instructions bow thrusters BOW5512D and BOW5524D 020522.11...
Need help?
Do you have a question about the BOW5512D and is the answer not in the manual?
Questions and answers