Operation; Establishing A Connection To The User Interface; Establishing A Direct Connection Via Ethernet; Establishing A Direct Connection Via Wlan - SMA SUNNY BOY 3.0 Operating Manual

Hide thumbs Also See for SUNNY BOY 3.0:
Table of Contents

Advertisement

8 Operation

8
Operation
8.1

Establishing a connection to the user interface

8.1.1

Establishing a Direct Connection via Ethernet

Requirements:
☐ The product must be commissioned.
☐ An end device (e.g. computer) with an Ethernet interface must be available.
☐ The product must be connected directly to the end device.
☐ The respective latest version of one of the following web browsers must be installed: Chrome,
Edge, Firefox, Internet Explorer or Safari.
☐ The SMA Grid Guard code of the Installer must be available for the changing of grid-relevant
settings after completion of the first ten feed-in hours or installation assistant (see "Application
for SMA Grid Guard Code" at www.SMA-Solar.com).
IP address of the inverter
• Standard inverter IP address for the direct connection via Ethernet: 169.254.12.3
Procedure:
1. Open the web browser of your end device, enter the IP address 169.254.12.3 in the address
bar and press the enter key.
Web browser signals a security vulnerability
2.
After the IP address has been entered, a message might appear indicating that the
connection to the user interface of the product is not secure. SMA Solar Technology AG
guarantees the security of the user interface.
• Continue loading the user interface.
☑ The login page of the user interface opens.
8.1.2

Establishing a direct connection via WLAN

Requirements:
☐ The product must be commissioned.
☐ An end device (e.g. computer, tablet PC or smartphone) must be available.
☐ The respective latest version of one of the following web browsers must be installed: Chrome,
Edge, Firefox, Internet Explorer or Safari.
☐ JavaScript must be enabled in the web browser of the end device.
☐ The SMA Grid Guard code of the Installer must be available for the changing of grid-relevant
settings after completion of the first ten feed-in hours or installation assistant (see "Application
for SMA Grid Guard Code" at www.SMA-Solar.com).
50
SBxx-1AV-41-BE-en-12
SMA Solar Technology AG
Operating manual

Advertisement

Table of Contents
loading

Table of Contents