Toshiba RAS-3M26U2AVG-E Service Manual page 96

Hide thumbs Also See for RAS-3M26U2AVG-E:
Table of Contents

Advertisement

No.
Part name
∗ Attachment
4-way valve
11
coil
Mount 4-way valve coil so that the label side
directs upper side of the cabinet.
Label
Label
Label
4-way valve coil
4-way valve coil
4-way valve coil
1. Detachment
PMV
12
Coil: Green
1) Perform work of Detachment 1 of
Coil: Red
2) Turn the coil clockwise (counterclockwise) and
Coil: Yellow
2. Attachment
1) Mount the PMV coil so that the coil lead wire
Coil: Mount yellow coil only so that lead wire
taking-out part directs upward.
2) Match the positioning projection of coil with
Detail B
Coil: Green
Coil: Red
Coil: Yellow
Procedure
Detail A
then remove it from PMV main unit. (All 4 pcs.)
taking-out part directs downward.
CAUTION
the concave part of PMV unit surely and fix it.
Detail A
4-way valve unit
4-way valve unit
4-way valve unit
.
1
Detail B
Turn clockwise
(counterclockwise)
Projection of PMV coil
- 96 -
FILE NO. SVM-18051
Remarks
Taking-off direction
PMV sideways
Concave part of PMV

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-3m26u2avg-tr

Table of Contents