INSTRUCTIONS: Use one page for each VERA-LIFT II™. Check each blank as that item is inspected. Note date inspected, initials of
maintenance staff member who performed inspection and repairs or adjustments made in the "COMMENTS" column.
Serial Number of Lift
JAN
Check nuts & bolts for
tightness
Inspect welds for cracks,
rusting & damage
Inspect wire connections
Check casters for
tightness/lint
Check battery voltage*
*26.4 volts if fully charged, approx. 24.0 volts if partially discharged (+ or - .5 volt). If voltage is less than 24 volts, change the battery.
Please follow the maintenance and inspection procedures outlined in the product manuals and record accordingly.
Based on institutional average usage data, Vancare recommends that all lifts be replaced every ten years or sooner
based upon the facilities usage and the findings during regular use, maintenance and inspections.
March 2019
MONTHLY VERA-LIFT II™ INSPECTION CHECKLIST
FEB
MAR
APR
MAY
For your nearest Distributor, call 1-800-694-4525
JUN
JUL
AUG
SEP
Year
OCT
NOV
DEC
COMMENTS
36