Download Print this page

Daikin FT24KV2S Service Manual page 13

Removal procedure, 5.0/6.0/7.1 kw class, 24000 btu/h class

Advertisement

Si041055
Step
Dislocate the electrical
10
box to the left and
unfasten the back hook.
Pull the electrical box
11
out.
2. Remove the PCBs.
1
Remove the screw on
the electrical box.
Push the shield plate
2
and unfasten the hook.
Removal Procedure
Procedure
Shield
plate
Hook
Removal of Electrical Box / PCBs / Swing Motors
The electrical box has a
hook on its back.
(R2777)
Catch the back hook of the
electrical box when
reassembling.
(R2778)
Screw: M4 × 16
(R2779)
The shield plate also has 2
hooks on the upper side.
(R13224)
Points
11

Advertisement

loading