Download Print this page

TRENDnet TI-PG541i Quick Installation Manual page 5

6-port hardened industrial gigabit poe+ layer 2 managed din-rail switch
Hide thumbs Also See for TI-PG541i:

Advertisement

3. Rotate the TI-PG541i downward towards the rail to lock it into
place. You will know it is secure when you hear the click.
Mounting the unit
4. To remove the unit, pull down to clear the bottom of the DIN-Rail
and rotate away from the rail.
Applying Power
1. Connect the power supply (sold separately) to the included terminal
block (as shown below) and secure with the screws.
Note: Polarities must match.
2. Attach the terminal block to the unit.
Releasing the unit
3

Advertisement

loading