Download Print this page

Installation Chart Step Procedure/Part Name Q'ty - Yamaha waverunner gp1200r Assembly Manual

Hide thumbs Also See for waverunner gp1200r:

Advertisement

HANDLEBAR AND THROTTLE CABLE INSTALLATION
EXPLODED DIAGRAM
INSTALLATION CHART
Step
Procedure/Part name
HANDLEBAR AND THROTTLE
CABLE INSTALLATION
1
Lower handlebar holder
2
Handlebar assembly
3
Upper handlebar holder
4
Bolt (with washer)
8 × 55 mm (0.31 × 2.17 in)
Q'ty
Follow "Step" order for installation.
2
1
NOTE:
2
Align the punched marks a on the handle-
bar with the top surface of the lower han-
dlebar holders.
The upper handlebar holder should be
installed with the punched mark b forward.
NOTE:
4
Tighten the bolts so that the front clearance
c of the upper handlebar holder is smaller
than the rear clearance d .
– 4 –
Service points
E

Advertisement

loading