Download Print this page

olympia electronics OLY-1004/WP/ADR Installation Instructions page 2

Emergency luminaire

Advertisement

Package Contents
1
Luminaire
1
Set of Pictograms
1
Mounting accessories
1
Manual
General
These devices are used indoors and outdoors
of the luminaire. If at the end of the test the autonomy
o
(ta 40 C) in places where emergency light is needed.
is lower than the nominal, the BATTERY FAULT LED will
Each device must be permanently connected to
lit and battery needs to be replaced. If the result of the
mains power supply. In normal operation the battery
test is good then the luminaire enters charging mode
is charging. The light source can be either on or off,
and the CHARGE LED starts blinking until the battery is
depending on user's choice. In case of a mains
fully charged.
power supply failure, the device enters emergency
mode and the illumination LED turns on. When the
Automatic Operational Test
mains power supply is restored the device turns to
This test includes all the operations that are provided
normal operation.
in manual test and is conducted automatically every
15 days and lasts 3 seconds.
Autonomy duration selection
The user can select one of the 3 available minimum
Automatic Autonomy Test
autonomy durations 1 hour, 3 hours and 8 hours. The
The Automatic Autonomy Test is conducted every 6
selection must be done while the luminaire is
months and measures the device's back up operation
disconnected from AC and battery supplies. The
and emergency duration. This test includes all
selection is achieved through Switches 2 & 3 of DS1
functions of the Manual Autonomy Test.
as shown below.
Addressable Communication
The luminaire has the ability to be connected to
GR-6500 panel. In order to do so, the luminaire's
1 2 3 4
1 2 3 4
1 2 3 4
address has to be unique in the same bus. For
1h
more details see the extra leaflet.
3h
8h
(default position)
Lens Removal
Technical label installation
When the luminaire is used without the pictograms
Two additional labels are included in the package.
or the SP-1100 and you require more light output
one for 3 hours duration (180) and one for 8 hour
then remove the lens that covers the LEDs.
duration (480). Depending on the selected duration,
the installer must cover the default 1 hour (60)
printing with one label that has the required
ΑΤΤΕΝΤΙΟΝ!!!
duration. Please take notice of the orientation of the
1. Operations for installation, maintainance or
label.
testing must be done by authorized personnel
only.
Manual Operational Test
2. Always use in any case round mains cable, with a
Remove the diffusor and then by pressing the test
diameter of 5-10mm (H05RN-F type 2x1mm² or
button briefly an operation test is initiated. The light
any other type, at least equal to it's mechanical
source and the emergency circuit of the device are
and electrical properties). ATTENTION!! The cable
tested. The manual test can be conducted only if the
must not be deformed in any way (This
mains power supply and the battery are connected.
requirement is important to ensure the ΙΡ rating).
During this test period the LAMP TEST LED will blink.
3. The device must be connected to the mains
The battery must have adequate charge. This test
power supply through a circuit breaker that is
lasts for 3 seconds.
depends on the total line's power load.
4. In case of battery replacement, it must be
Manual Autonomy Test
replaced by the same type, by the manufacturer
A duration test can be conducted by pushing the
or a competent person.
button steadily for 5 to 10 seconds. In order to be
5. In case of inactive use for a period greater than 2
performed, the mains power supply should be
months, disconnect the battery by pulling out the
connected and the battery should be fully charged.
battery's connector.
The luminaire enters emergency mode, the CHARGE
6. I
t i
s not allowed to discard batteries into
LED is turned OFF and the BATTERY FAULT LED starts
common trash bins, they must be discarded
blinking. Its duration is the stated autonomy duration
only
incinerate.
Indications LED Status
LAMP
BATT.
CHARGE
Description
FAULT
FAULT
(green)
(red)
(yellow)
Charging
Fully charged
Battery fault or
emergency mode
Operational test
Light source fault
Autonomy test
Duration fault
1
Installation Instructions
1
3
2
1
4
Drill one of the 5 available holes with a 16-18mm drill bit. Install the included rubber gasket and pass
through the power cables. Install the included tie (if needed) to fasten and securely the power cables.
5
6) Autonomy Duration Selection
(Read on General Informations, Page 1)
6
7 b) Non-Maintained Operation
N
L
Ν for neutral, L for live wire WARNING!! Isolate the mains power supply before making the connections.
in battery recycling points. Do not
7
8) Communication Connection
A
From
B
GR-6500 Panel
Note:
Permanently
Communication Connection
ON
8
Battery Connection
Blink
Off
Indifferent
9
2
923100401_09_002
2
A
B
4
3
5
7 a) Pernament Maintained Operation
N
L
or
Link
1 2 3 4
Switch number 4 of DS1
must be in ON position.
Ν for neutral, L for live wire
WARNING!! Isolate the mains power supply before making the connections.
7
7 c) Controlled Maintained Operation of the lamp
N
L
External
and
and
switch
1 2 3 4
Switch number 4 of DS1
Switch number 4 of DS1
must be in OFF position.
must be in OFF position.
Drill another hole (according to step 5). Install the included rubber
gasket and pass 2 signal cables and connect them on the A, B
terminals minding the correct polarity. These cables are used to
connect the luminaire to GR-6500 panel.
8
10
923100401_09_002
Attention!! The 6 plastic
latches (A) must be secured
(click
requirement is important to
ensure the IP65 rating.
Power on the luminary.
11
Pictogram Installation
A
1 1
2 2
Mounting Methods
Oly luminaires can be surface mounted on walls or ceilings. For these mounted installations, special
accessories are included.
Wall
bottom
Wall installation
view
Extra Mounting Methods *
* ATTENTION!!! The below mounting methods can be done after request of the necessary
mounting accessories!!
Suspended installation with A-3018 accessory
The luminary can be installed in a suspended
ceiling.
1 2 3 4
A marking panel (SP-1100) can be installed on the luminary pointing the desired direction.
Ceiling installation
with marking panel
NOTE!!
After finishing the installation you must power the luminaire for at least 24 hours in order to
completely charge the battery. The rated autonomy duration can be achieved after that time.
3
sound).
This
12
2
1
1. Fit the pictogram you need to the diffuser, be careful to
secure it on the 3 plastic holders.
2. Refit the diffusor with the pictogram.
Ceiling
Ceiling installation
Suspended ceiling installation
with mounting accessory
A-3018
Suspended ceiling installation
with mounting accessories
and marking panel
923100401_09_002

Advertisement

loading

This manual is also suitable for:

2701205