To avoid cracks in the material, a pre-heating of the base material of min. +80 ° C is recommended. The welding area at the pewag bluetrack should be dry and clean before welding the stub. The welding seam should not be more than 5 mm.
Page 2
Now start to finish the welding on each side of the stubs, see blue marking. Start first with step 1 – 4 and then continue with step 5 – 8 as shown in the illustration. Leave yourself enough time between the process steps so that the material is allowed to cool down.