Siemens 3AP2-FI Operation & Maintenance Manual page 57

400kv
Table of Contents

Advertisement

H
Wood
1.4
Connecting plate
1.5
Lower lifting eye plate
15
Comer gear
15.9.01
Lever
1.8
Upper lifting eye plate
Fig. 34
Installing insulator columns (diagram shows the top
insulator column in the kit)
Loosen and remove the 2 lifting eye plates 1.5.
Before you raise the insulator column place a wooden base under the corner gear. This will prevent damage
when turning. Now lift the insulator column carefully by the 2 angled lifting eye bolts 1.8.
Make sure that the crane hook and the insulator column head are always vertical to prevent the insulating
columns slipping when lifted.
The connecting plate 1.4 can then be loosened and removed.
You can remove the lower connecting plate once the insulator column has been lifted far enough.
Now insert the insulator column carefully into the carrier opening.
Fig. 37
Breaker pole mounted
4 Installation
56

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents