Typical Wiring Schematic; Typical Installation - Bryant 313AAV/JAV Product Data

4-way multipoise induced-combustion gas furnace input capacities: 45,000 thru 135,000 btuh
Table of Contents

Advertisement

TYPICAL WIRING SCHEMATIC

FIVE WIRE
THREE-WIRE
HEATING-ONLY
BLOWER DOOR SWITCH
BLK
BLK
WHT
WHT
GND
AUXILIARY
115-V FIELD-
J-BOX
SUPPLIED
DISCONNECT

TYPICAL INSTALLATION

CONDENSING
UNIT
AIRFLOW
NOTE 2
W
C
R
W
C
R
O
N
T
GND
R
G
O
L
COM
NOTE 1
Y/Y2
24-V
TERMINAL
BLOCK
NOTES:
FURNACE
ELECTRONIC
AIR CLEANER
FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-V WIRING
THERMOSTAT
G
Y
TERMINALS
CONDENSING
UNIT
TWO
WIRE
1.
Connect Y-terminal in furnace as shown for proper blower operation.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
HUMIDIFIER
11
FIELD-SUPPLIED
DISCONNECT
208/230- OR
460-V
THREE
PHASE
208/230-V
SINGLE
PHASE
GND
GAS-FIRED
WATER HEATER
A99440
A08177

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

313aav plus 80x313jav plus 80x

Table of Contents

Save Article as PDF