Required Cable Length - Delta EV Ultra Installation Manual

Fast charger
Table of Contents

Advertisement

Example of calculation for charger with 150kW DC charge capacity, 22kW AC and 43kW AC charge capacity:
Note! Charger controller will limit I
The recommended minimal cable cross section accepted by charger terminals is 95mm
cross section accepted by terminals is 300mm
bending radius is suitable for cable glands and plinth dimensions.
Use of aluminium cable is prohibited. The charger is cyclic load resulting to cycling thermal expansion and
contraction of cables. This increase risk of hotspots. During annual maintenance, check the cable connection
in charger and also in distribution board.
Available AC connection – current rating for EV QC with DC plugs, AC 22kW.
DC charge capacity [kW]
Maximal AC current [A]
Fuse rating in AC distribution [A]
Cable cross section (Cu) [mm2]
Available AC connection – current rating for EV QC with DC plugs, AC 43kW.
DC charge capacity [kW]
Maximal AC current [A]
Fuse rating in AC distribution [A]
Cable cross section (Cu) [mm2]
Available AC connection – current rating for EV QC with DC plugs, AC 43kW and AC 22 kW.
DC charge capacity [kW]
Maximal AC current [A]
Fuse rating in AC distribution [A]
Cable cross section (Cu) [mm2]
Note! Cable cross section is based on IEC 60364-5-52:2011 standard (Cu conductor, multi-core
cable, 3 live cores, PVC insulation, in the earth – D2 case). Site specific conditions must be taken
into account for proper dimensioning. For different types of cables and installation conditions please
refer to cable fact sheet or consult with Delta customer service.

4.1.2 Required cable length

Installation site should be prepared with AC cabling to supply L1, L2, L3, N, PE. Cable length should be at
least 1,5 meter long from base. Cable should be prepared inside the footprint of the EV quick Charger. Check
exact cable location in chapter 4.5.3
6
�������� = 12 × 19,29 + 32 + 63 + 1 = 327 ��
�������� = 12 × 21,43 + 32 + 63 + 2 = 354 ��
current to 336A.
max
2
. Site planning needs to check if the cable diameter and
50
120
125
95
50
151
160
95
50
183
200
120
110kW platform
150kW platform
227
250
185
110kW platform
150kW platform
258
315
240
110kW platform
150kW platform
290
315
240
EV Ultra Fast Charger Site preparation
2
. The maximal cable
291
315
240
322
355
300
354
355
300

Advertisement

Table of Contents
loading

Table of Contents