EV Ultra Fast Charger Preparing for the installation
Figure 6 Installation dimensions – AC connections
Prepare holes for 4 x M10 Anchor bolts.
Remove plinth hatches seen in figure below.
Figure 7 Remove plinth
Terminal block L1, L2, L3
hatches
Terminal block N
Terminal block PE
13