Delta EV Ultra Installation Manual page 21

Fast charger
Table of Contents

Advertisement

GND
L1
N
15 min
kWh (Impulse) +A
(Messperiode)
Power meter
EV Ultra Fast Charger Load-management connection installation
Make sure ioLogic R1212 device is set with value 1 in X1 position (refer to 0).
Make sure ioLogic R1212 device is set with value 1 in X10 position (refer to 0).
Make sure ioLogic R1212 device is set off in Dual Run (refer to 0).
Figure 14 ioLogic settings
Connect L, N and PE cables to terminals.
Switch on MCB.
Confirm ioLogic R1212 device is signalling "PWR" and RDY statuses.
Resistor 120 Ohm
GND
V+
DC
AC
12V
L N
B2
Load-management
connection box
Figure 15 Load-management connection box – connection diagram
Cat5e, outdoor cable
120
ioLogic
R1212
COMM
V-
DI0
DI1
GND
120
1 2 3
4 5 6
RS485
RUT955
EVC
Address: 11
Resistor
120 Ohm
19