Do's & Don'ts - Warmup WHS-M-S3-Series Installation Manual

Table of Contents

Advertisement

Do's & Don'ts
Ensure the WHS-M-S3-XX manifold is mounted to a structurally
sound wall capable of bearing the load imposed by the manifold.
Precautions should be taken to reduce the risk of damaging any
services within the walls when drilling.
Keep the area clean and clear, reducing the risk of foreign bodies
entering the system.
Use suitable pipe cutters to ensure a square, clean cut is made to
the pipework.
Ensure all data is fully recorded on the commissioning log.
Ensure, where the system is subject to the risk of freezing, the
system is purged or a suitable antifreeze, such as Glycol (up to
30% by volume) is used.
Do not exceed specification - failure to do so will void the
warranty.
Do not use excessive force when adjusting flow gauges.
Do not guess the flow rates or temperature settings, as this
will waste energy, and potentially incur higher running costs
compared to a correctly designed and commissioned system.