Husqvarna P 520DX Operator's Manual page 17

Hide thumbs Also See for P 520DX:
Table of Contents

Advertisement

Available languages

Available languages

7. Remove the 2 screws and the service hatch.
8. Pull back the coupling of the drive shaft and attach
the drive shaft to the PTO.
Note:
Make sure that the arrow on the symbol
points to the product.
9. Put the rear lock chain around the lift beam.
10. Attach the lock chain to the drive shaft.
11. Pull back the coupling of the drive shaft and attach
the drive shaft to the bevel gear shaft of the cutting
deck.
12. Fold the rubber casing above the shaft joint.
13. Put the front lock chain around the pipe.
14. Attach the lock chain to the drive shaft.
15. Attach the service hatch and tighten the screws.
16. Start the engine.
1593 - 002 - 22.12.2020
17. Move the lift lever rearward to lift the cutting deck.
Lift until the pivot wheels of the cutting deck do not
touch the ground.
18. Stop the engine.
19. Pull the spring (E) and attach to the lifting eyes on
the cutting deck (F).
F
20. Do a check of the parallelism of the cutting deck.
To do a check of the parallelism of the
Refer to
cutting deck on page 35 .
To attach the cutting deck Combi 132
X, Combi 155 X
1. Attach the cutting deck. Refer to
cutting deck Combi 132, Combi 155 on page 16 .
2. Put the hydraulic hoses from the cutting deck
through the loop.
E
To attach the
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 525dxP 525dx cabin

Table of Contents