Husqvarna P 520DX Operator's Manual page 16

Hide thumbs Also See for P 520DX:
Table of Contents

Advertisement

Available languages

Available languages

12. Fold the rubber casing above the shaft joint.
13. Put the front lock chain around the pipe.
14. Attach the lock chain to the drive shaft.
15. Attach the service hatch and tighten the screws.
16. Start the engine.
17. Move the lift lever rearward to lift the cutting deck.
Lift until the pivot wheels of the cutting deck do not
touch the ground.
18. Stop the engine.
19. Pull the spring (E) and attach to the lifting eyes on
the cutting deck (F).
F
20. Do a check of the parallelism of the cutting deck.
To do a check of the parallelism of the
Refer to
cutting deck on page 33 .
To attach the cutting deck Combi 132
X, Combi 155 X
1. Attach the cutting deck. Refer to
cutting deck Combi 132, Combi 155 on page 15 .
2. Put the hydraulic hoses from the cutting deck
through the loop.
16
E
To attach the
3. Connect the hydraulic hoses to the coupling on the
product. The flange and the notch must line up
correctly.
Note:
The position of the hydraulic hoses controls
the operation function of the cutting height lever. To
change the operation function of the cutting height
lever, change the position of the hydraulic hoses.
To remove the cutting deck
1. Park the product on level ground.
2. Stop the engine.
3. Move the cutting height lever forward and rearward
2–3 times to release remaining pressure.
4. For Combi 132 X and Combi 155 X, release the
couplings and disconnect the hydraulic hoses.
5. Apply the parking brake.
6. Move the lift lever forward to lower the cutting deck.
Stop before the pivot wheels of the cutting deck
touch the ground.
7. Pull the spring (A) and remove the lifting eyes (B).
8. Start the engine.
B
A
1593 - 002 - 22.12.2020

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 525dxP 525dx cabin

Table of Contents