Installation Checklist; Final Preparation - Bertazzoni MAST365INMXE Installation Manual

Freestanding electric ranges
Hide thumbs Also See for MAST365INMXE:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION CHECKLIST

A qualifi ed installer should carry out the following
checks:
Range mounted on its legs
Island trim or Backguard attached accor-
ding to instruction
Anti-tip device properly installed
Clearance to cabinet surfaces as manu-
facturer's guideline
/ Installation checklist / fi nal preparation

FINAL PREPARATION

Before using the oven, remove any protective
wrap from the stainless steel.
All stainless steel body parts should be wiped
with hot, soapy water and with a liquid stainless
steel cleanser.
If buildup occurs, do not use steel wool, abrasi-
ve cloths, cleaners, or powders!
If it is necessary to scrape stainless steel to re-
move encrusted materials, soak with hot, wet
cloths to loosen the material, then use a wood
or nylon scraper.
Do not use a metal knife, spatula, or any other
metal tool to scrape stainless steel! Scratches
are almost impossible to remove.
Before using the oven for food preparation,
wash the cavity thoroughly with a warm soap
and water solution to remove fi lm residues and
any dust or debris from installation, then rinse
and wiped dry.
Attention!
When using the oven for the fi rst time it
should be operated for 15-30 minutes at a tem-
perature of about 500°F/260°C (main oven) or
440°F/227°C(auxiliary oven) without cooking
anything inside in order to eliminate any moi-
sture and odours from the internal insulation.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents