Leak Check - GOK GS Pro-Fi 3 Assembly And Operating Manual

Combined heating oil filter breather type
Hide thumbs Also See for GS Pro-Fi 3:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
More information about compression fittings can be found at:
www.gok.de/datenblaetter/Schneidringverschraubungen.
Installation position and mounting
Installation position vertical as a matter of principle,
filter tray
with filter insert
vent tray
at the top.
The GS Pro-Fi 3 is delivered with pre-mounted holding plate
mounted on both sides of the housing.
Pull down the holding plate, remove the holding plate, suspend it with the screws on the
opposite side of the housing, and push it upwards.
The specialised company and the operator must observe, comply with and understand all of
the following instructions in this assembly and operating manual. For the system to function
as intended, it must be installed professionally in compliance with the technical rules
applicable to the planning, construction and operation of the entire system.
Metal chips may cause eye injuries.
Wear safety goggles!
Malfunctions caused by residues! Proper functioning is not guaranteed.
Visually check that there are no metal chips or other residues in the connections!
It is important that metal chips or other residues are blown out!
Install with suitable tools, if required.
Regarding screw connections, use a second spanner to brace against the connection
nozzle. Do not use unsuitable tools, such as pliers.
Option assembly metal filter tray PS 16bar instead of plastic filter tray
• Loosen the clamping ring
• Do not damage the O-ring, refurbish if required (oil new O-ring!).
• Fit the metal filter tray and the O-ring and manually tighten by rotating the clamping ring
in a clockwise direction.
• Perform leak testing activities!

LEAK CHECK

The leack check and/or pressure test according to the technical rules for oil systems (TRÖl)
and according to DWA-A 791 (TRwS) must be carried out:
• before initial start-up,
• after major changes,
• after repairs,
• after the system has been out of operation for more than one year.
Prior to start-up, the oil system with GS Pro-Fi 3, including the connections, must be
subjected to leak testing. This may be performed within the framework of leak testing
pursuant to TRÖI and worksheet DWA-A 791, as well as function check of the oil system.
In the event of possible leaks, these must be eliminated, e.g. repeated assembly of the
connections using new gaskets, tightening of the screwed connections.
Observe the notice in MAINTENANCE!
8 / 12
Combined heating oil filter breather type GS Pro-Fi 3
at the bottom
Risk of injuries due to blown-out metal chips!
by anti-clockwise rotation, hold and remove the filter tray.
for wall assembly. It can be
Part no. 13 512 53 b

Advertisement

Table of Contents
loading

Table of Contents