Assembly - GOK GS Pro-Fi 3 Assembly And Operating Manual

Combined heating oil filter breather type
Hide thumbs Also See for GS Pro-Fi 3:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13

ASSEMBLY

Before assembly, check that the product is complete and has not suffered any damage during
transport. Installation, maintenance and start-up may only be carried out by companies that
are specialist companies for this work in terms of Section 62 of the German Ordinance on
Facilities Handling Substances Hazardous to Water (AwSV).
Connection assembly
Universal connection set (UA):
More information about Universal connection fitting type UA
can be found at www.gok.de/montagehinweise.
Part no. 13 512 53 b
Combined heating oil filter breather type GS Pro-Fi 3
The female thread can also take the GOK universal
connection set type UA, which corresponds to a
compression joint type G acc. to EN 12514-4:
Annex D.
Piping used:
Copper pipe with outer diameter 6, 8 or 10 mm, e.g.
acc. to EN 1057
The housing is made from a zinc die-cast alloy:
Do not use a conical pipe thread acc. to EN 10226-1.
Flexible pipe assembly
The following connections may be used in addition for
flexible oil lines and their pendant:
• cap nut G 3/8 with inside taper 60° pursuant to
EN 12514-4 Appendix B
A reinforcement ring must be used with all thin-walled
pipes and with soft pipe materials.
Brass reinforcement rings may not come into contact
with aluminium pipe. Risk of corrosion!
Female thread G 3/8 acc. to EN ISO 228-1, as
screw-in opening G 3/8-UA-O acc. to
EN 12514-4 Figure D.1
O-ring dimensions 14x2 mm, included with delivery
Screw-in connectors, type B acc. to EN ISO 1179-4
or EN 12514-4 Annex C (adequate with type A acc.
to DIN 3852-2). The recommended maximum
torque with steel screw-in connector is 15 Nm
7 / 12

Advertisement

Table of Contents
loading

Table of Contents