O-Rings Reference Chart - Sherwood Scuba maximus SRB5600 Assembly & Maintenance Manual

Table of Contents

Advertisement

3.0 O-RINGS REFERENCE CHART

1.
Before you begin disassembly of the regulator, test the first and second stages for output
pressures and leakage. Pre-testing in this way will help the technician to pinpoint any specific
problems requiring repair.
2.
The work area must be clean and well lighted, with clean compressed air available to blow
sand and dirt from parts.
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents