Handling Tips - Sherwood Scuba maximus SRB5600 Assembly & Maintenance Manual

Table of Contents

Advertisement

6.4

HANDLING TIPS

How your customers treat their regulators will directly influence the unit's function and
durability. Following are a few tips that you can pass on to your customers to help assure the
durability of their Sherwood Scuba regulator.
A.
Pre-Dive Checks
1.
Check the hoses and hose connections for cuts, abrasions or other signs of damage before
mounting the regulator on the tank valve. Slide the hose protectors back to inspect the areas of
the hose normally covered. Be sure all hose connections are tight.
2.
Before turning on the tank air valve, check to make sure that the yoke nut or DIN connection is
tight and the regulator body is aligned properly, with no kinks in the hoses.
3.
Turn the tank valve on slowly and listen for leaks. If any leaks are found, replace or repair parts
as recommended.
4.
Never lift the tank/BCD assembly by the regulator or hoses.
5.
Just before mounting the regulator on the valve, always turn the valve on briefly to blow any
trapped water out of the valve. There is often saltywater trapping in the outlet side of the valve.
This entrapped salt water being blown through the interior of the regulator is the number one
source of internal corrosion and problems with the dry air bleed system.
6.
Surface-test the regulator by breathing lightly through the mouthpiece. Depressing the purge
button above the water's surface is not an appropriate method for testing the function of the
regulator.
B.
Post-Dive Care
1.
After the dive, blow all water out of the dust cap with clean dry air and place the cap securely
on the regulator inlet. On multiple tank dives, use great care to keep salt water out of the
regulator inlet when tanks are changed. Neglecting these simple procedures is the greatest
cause of corrosion and wear in scuba regulators. When used properly, Sherwood's exclusive
Dry Air Bleed System keeps all other water-borne contamination out of the first stage body.
NOTE: A tiny stream of air bubbles escaping from a small black valve on the first stage indicates that the
Dry Air Bleed System is working. The amount of air used is negligible (13 - 27 cc/min.). Check the system
periodically (see Section 4.3B in this manual), particularly after servicing, to ensure that there is some air
escaping from the black one-way bleed valve. If no air is escaping from the valve when air pressure is applied
to the first stage, have the regulator inspected.
2.
With the dust cap securely in place, rinse the first and second stages in clean fresh water. DO
NOT depress the purge button before or during rinsing since this may introduce water into the
second stage and the low pressure hose. Shake or blow all excess water from the second
stage and allow the entire regulator to air-dry before storing.
3.
Store the regulator in a clean bag or storage box, away from sunlight, excessive heat and
humidity.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents