Sherwood Scuba maximus SRB5600 Assembly & Maintenance Manual page 22

Table of Contents

Advertisement

D.
Intermediate Pressure Air Leaks
1.
Attach the regulator first stage to a tank short enough to totally submerge the first and second
stage in your filling station cooling water. Adjust the breathing effort knob to the minimum
breathing effort position (not the slight freeflow position).
2.
With the tank valve still turned off, flood the second stage completely with water, and then
position it mouthpiece up.
3.
Turn the tank air valve on slowly and then watch for any leaks in the first or second stage
(except for the normal flow of air from the one-way bleed valve on the first stage).
4.
Repair any leaks.
5.
Check for the correct positive air purge flow rate. See Section 4.4, "Testing of First Stage,"
for the proper method.
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents