Manual Inflating - ETEKCITY EAM-DT1 Manual

Table of Contents

Advertisement

4.
When the mattress has reached the desired
firmness, turn the control dial to "Off".
Note:
• Make sure the control dial arrow is aligned
with the "Off" dot. You will hear a click when
the dial is positioned correctly.
• After 5 minutes of continuous use, the
air pump will start to overheat and will
automatically turn off. Allow the air pump to
cool down for 30 minutes before resuming
use.
5.
Lie on the mattress to test the firmness.
6.
Optionally, adjust the firmness by either
continuing to inflate the mattress or turning
the control dial to "Deflate" to let some air out.
[Figure
3.1]
7.
Make sure there is no hissing sound or air
coming from the built-in air pump. If this occurs,
make sure the control dial arrow is in the "Off"
position.
8.
Unplug from outlet, and store the cord in the
storage compartment.
10

Manual Inflating

1.
Make sure the built-in air pump is turned
off. The control dial arrow for the built-in air
pump should be aligned with the "Off" dot.
[Figure
2.1] You will hear a click when the dial is
positioned correctly.
2.
Pull the tab to open the outer manual air valve.
[Figure
2.2] Connect an air pump or hose to the
valve
3.
Inflate to the desired firmness and disconnect
the air pump.
4.
Lie on the mattress to test the firmness.
Optionally, adjust the firmness.
5.
Make sure the manual air valve is completely
closed. If there is a hissing sound or air coming
from the valve, it is not fully closed.
Figure 2.1
Figure 2.2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eam-dq1

Table of Contents