III-A. Included Components and Parts

The following items are included with your load bank. If any of the following are not
included, please contact your Simplex representative or call Simplex Direct, Inc., at 800-
637-8603.
Load bank
1.
Manual
2.
Electrical drawings package
3.

III-B. Primary Inspection

Preventative visual inspection of the shipping crate and the load bank is advised.
Physical or electrical problems due to handling and vibration may occur. Never apply
power to a load bank before performing this procedure. The following five-point
inspection is recommended before installation and as part of a 6-month maintenance
schedule or as a load bank is relocated:
If the crate shows any signs of damage, examine the load bank in the corresponding
1.
areas for signs of initial problems.
Check the entire outside of the cabinet for any visual damage, which could cause
2.
internal electrical or mechanical problems due to reduced clearance.
Inspect all relays and control modules. Make sure all components are secure in their
3.
bases and safety bails are in place. Spot check electrical connections for tightness.
If any loose connections are found, inspect and tighten all remaining connections.
Examine all accessible internal electrical components such as fuses, contactors, and
4.
relays. Check lugged wires at these components.
Visually inspect the element chamber for foreign objects, broken ceramic
5.
insulators, and mechanical damage.
Call Simplex if you have any problems during installation.
24-hour contact at 800-637-8603
dynaMITE Load Bank Manual
III. UNPACKING
March 2, 2021 • Simplex Service 800-637-8603 • Page 9 of 17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DYNAMITE and is the answer not in the manual?

Table of Contents