3. Turn water supply on to flush the line and then shut the water off
using the ball or gate valve.
4. Wrap the male threads of the PVC adapters with 4-6 layers of Teflon
tape, then tighten into the valve with a wrench.
5. Glue fittings to PVC main line and allow to dry.
6. Turn water supply on to pressurize the system. The controller will
open momentarily and then will shut off.
7. The unit is now ready to be programmed
Figure 6a
Above-ground installation
7. PROGRAMMING
• Download the DIG BTT app using the iOS App Store, Google Play, or
the QR code on the box.
• Open the DIG BTT app from your smartphone or tablet and use the
instructions in the App Screens Overview to program and operate
the controller.
flow
Figure 6b
Below-ground installation
4