Page 1
Double / Queen Headboard Assembly Instructions Model # HFQ-0500-1 This product is shipped in 1 carton CONTACT US FIRST parts@prepacmfg.com 1-877-PREPAC1 1-877-773-7221 Mon - Fri 7am - 4pm PST 10am - 7pm EST For help with assembly If you have received a damaged or defective part or are missing hardware.
Hardware Identification Identification de quincaillerie 24mm Green 15mm Zinc Cam (large) (28) Cam Cover Cap (10) Twister Dowel (28) Ferrure en zinc grand Capuchons de came Goujon de torsion vert RM-0103 RM-0807 ebony / ébène* RM-0501 RM-0809 white / blanc Confirmat Screws (4) ¾”...
Page 3
Headboard Parts Pièces de tête de lit Top (1) Inner Gables (2) Backer (1) Dessus pignons intérieur TP-10045-H GA-10047-H BB-10038-H washed black / noir délavé washed black / noir délavé washed black / noir délavé TP-10045-W GA-10047-W BB-10038-W white / blanc white / blanc white / blanc Fixed Shelf (1)
Page 4
Step 1 Estimated Time: 10 Minutes Insert cams into the back of the headboard panel (H7) Screw 2 of the green twister dowels into the and the bottom of the fixed shelf (H4) where shown fixed shelf (H4) where shown Insérez les ferrures dans le dos du panneau de tête de Vissez deux des goujons de torison vert à...
Page 5
Step 2 Estimated Time: 10 Minutes Screw green twister dowels into the side moldings (H11) where shown Vissez les goujons de torison vert aux moulures latéral (H11) comme montre Green Twister Dowel Goujon de torsion vert Insert cams into the the left (H5) & right (H6) sides Insérez les ferrures aux côtés gauche (H5) et droit (H6) FRONT DEVANT...
Page 6
Step 3 Estimated Time: 5 Minutes Insert cams into the holes on the top of the left (H5) right (H6) sides Insérez les ferrures dans les trous en Haut haut du côtés gauche (H5) et droite Green Twister Dowel (H6) Goujon de torsion vert Screw green twister dowels into the left (H5) and right (H6) sides where shown...
Page 7
Step 4 Estimated Time: 10 Minutes Attach front stabilizer (H8) IN FRONT of the headboard panel (H7) Attachez le renforcement avant (H8) À L’AVANT du panneau de tête de lit (H7) #8 -1 1/8” Washerhead Wood Screws Front Vis en bois no.8 Devant 1-1/8 po.
Page 8
Step 5 Estimated Time: 10 Minutes Attach Left Lower Stabilizer (H9) to the Left Side (H5) and the Right Lower Stabilizer (H10) to the Right Side (H6). Tighten cams using a flathead screwdriver. Attachez le renforcement inférieure GAUCHE (H9) au côté GAUCHE (H5) et attachez le renforcement inférieure DROITE (H10) au côté...
Page 9
Step 6 Estimated Time: 10 Minutes Insert cams into the Inner Gables (H2) where shown Insérez les ferrures aux pignons intérieur (H2) comme montre. Attach inner gables (H2) to fixed shelf (H4) with Confirmat screws. MAKE SURE THE FINISHED EDGE IS FACING THE FRONT Attachez les pignons intéieures (H2) à...
Page 10
Step 7 Estimated Time: 10 Minutes Screw green twister dowels into the top (H1) where shown Vissez les goujons de torison vert au dessus (H1) comme montre Green Twister Dowel Goujon de torsion vert Attach the top (H1) then, tighten cams. Attachez le dessus (H1) puis, serrez les ferrures Page 10 of 12...
Page 11
Attach backer with nails Step 8 Estimated Time: 5 Minutes Attachez le dos avec les clous Line up the backer (H3) on the back of the headboard so that each edge is 2mm inset from the outer sides. Make sure the finished side is facing the front Alignez le dos (H3) à...
Page 12
Now, secure the backer to the fixed shelf and each side. Maintenant, fixez le dos à la tablette fixe et de Holes are NOT pre-marked. chaque côté. Les trous ne sont pas pré-marquées. Position the nail in the center of the edge and hammer Positionner le clou dans le centre du bord et d’un the nail straight in.
Need help?
Do you have a question about the HFQ-0500-1 and is the answer not in the manual?
Questions and answers