ZEPHYRONLINE.COM
Mounting the Hood
4. Lift hood into bottom opening of cabinet and secure to interior of cabinet using (12) #8 x 1/2"
stainless steel screws; (4) screws in the front and (4) screws in the sides and (4) screws in the back.
FIG. D.
5. Finalize installation of electrical and duct work. Seal duct work with certified aluminum duct tape.
Power on hood, check for leaks around duct tape and verify proper operation.
NOTE: If access to top of hood is not available after installation, electrical and duct work connection
may need to be made prior to installing the hood.
Monsoon Mini II Use, Care, and Installation Guide
Installation Instructions
FIG. D
15
Need help?
Do you have a question about the Monsoon Mini II and is the answer not in the manual?
Questions and answers