Ducting Preparation - Zephyr Monsoon Mini II Use, Care And Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Ducting Preparation

If vertically ducting hood with 7" round collar or if using hood in recirculating mode, skip these steps
and turn to the next page.
Vertical Ducting
(3-1/4"x10"
Rectangular)
Horizontal Ducting
(3-1/4" x 10"
Rectangular)
16
1. Remove 7" round transition
collar on top of hood by (6) M4 x 6
screws.
1. Remove 7" round transition collar
on top of hood by (6) M4 x 6 screws
and secure rectangular top cover
plate to top of the hood.
3. Secure 3-1/4" x 10" rectangular
collar to back of hood using (6) M4
x 6 screws.
Monsoon Mini II Use, Care, and Installation Guide
M O N S O O N M I N I I I
2. Secure 3-1/4" x 10" rectangular
collar to top of hood using (6) M4 x
6 screws.
2. Using a flat-head screwdriver,
remove the rectangular knock-out
plate located on back of hood.
C O R E
I N S E R T

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Monsoon Mini II and is the answer not in the manual?

This manual is also suitable for:

Ak9528asAk9534asAk9540asAk9546as

Table of Contents