Eastwood 31554 Instructions Manual page 4

Heavy duty tear down table
Table of Contents

Advertisement

ASSEMBLY
The Eastwood Tear-Down Table consists of moderately
heavy metal components which can cause potentially
serious injuries if allowed to drop. Avoid pinching hands
while handling parts during assembly. Obtaining the
assistance of a helper during assembly is necessary.
The use of safety shoes is advised.
• Begin by placing the Drain Work Top [A] upside down on a soft surface.
NOTE: there are two Drawer Mount, Frame Members attached to the
Drain Work Top with four M8 Bolts. This is done for shipping purposes
and must be temporarily removed and set aside for later re-assembly
(FIG 1).
• Set the flanged rail of a Leg Assembly [B] with three punched holes
aligned with three punched holes in the underside flange on one side of
the Drain Work Top [A]. Secure with three M8 x 15 bolts [H] Washers
[J] and M8 Nuts [K] (FIG 2).
• Repeat for 2nd Leg Assembly [B].
NOTE: The Drawer Assembly [C] consists of two major components:
The Drawer and Drawer Box. They are shipped assembled and must be
separated in order to complete the installation on the Drain Work Top.
To separate:
- Locate the Drawer Glide Latches (FIGS 3 & 4) and press DOWN on
the right side latch and simultaneously press UP on the left side latch
while pulling the Drawer OUT of the Drawer Box.
- Set the Drawer aside for later re-assembly.
4
FIG. 1
 """"
 """"
FIG. 2
 """"
 """"
 """"
FIG. 3
Right Side
FIG. 4
Eastwood Technical Assistance: 800.544.5118 >> techelp@eastwood.com
Temporarily
Remove
H, J, K
A
H, J, K
B
H, J, K
Drawer
Push Up
Pull Out
Box
Push Down
 """"
A
Box
Drawer
Left Side
Pull Out

Advertisement

Table of Contents
loading

This manual is also suitable for:

98017

Table of Contents