Table of Contents

Advertisement

Available languages

Available languages

Quick Links

Outdoor Kitchen Alum Grey Glass 32" Bar
Use two or more people to move, assemble or install cabinets and locker to avoid back injury.
Do not leave children unattended near cabinets. High risk of tipping if cabinets are installed
incorrectly: securely attach cabinets to the wall to avoid serious injury.
For assistance, call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com
STOP
Warning: Excessive weight
hazard!
Use two or more people to move, assemble, or
install cabinets to avoid back injury. Do not
leave children unattended near cabinets. High
risk of tipping if cabinets are installed
incorrectly: securely attach cabinets to the
wall to avoid serious injury. For assistance, call
1.877.306.8930; for U.K 0800.031.4069: e-mail at
info@newageproducts.com.
ATTENTION
Need help or spare parts? For fastest service,
contact NewAge Products at 1-877-306-8930;
or support@newageproducts.com.
Do not return to the retailer.
: Is your cabinet damaged?
65203-INSTL-01-Rev.05

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Outdoor Kitchen Alum Grey Glass 32 Bar and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Newage Outdoor Kitchen Alum Grey Glass 32 Bar

  • Page 1 For assistance, call 1.877.306.8930; for U.K 0800.031.4069: e-mail at info@newageproducts.com. ATTENTION : Is your cabinet damaged? STOP Need help or spare parts? For fastest service, contact NewAge Products at 1-877-306-8930; or support@newageproducts.com. Do not return to the retailer. 65203-INSTL-01-Rev.05...
  • Page 2: Weight Capacity

    Weight Worktops Capacity 32" Worktop. Fits over 1 Cabinet lbs. 56 " Worktop. Fits over 1 Cabinet & Fridge nook. lbs. 64" Worktop. Fits over 2 Cabinets 88" Worktop. Fits over 2 Cabinets lbs. & Fridge nook. 32" - SS Bar Cabinet 96"...
  • Page 3: Parts Supplied

    Unpacking • Begin by placing the package on a protected at surface. • Remove all cardboard, foam packaging material and clear plastic bags. • Dispose / recycle all packaging materials. • Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below. Parts Supplied Bar Cabinet Height Adjustable Levelers...
  • Page 4: Limited Warranty

    Customer must pay for shipping costs associated with any replacement product or parts. This limited warranty is limited to product replacement only. In no event will NewAge be liable for special, indirect, or consequential damages. This limited warranty is available to the initial purchaser only and is not transferable. Proof of purchase and additional information regarding the defect may be required at NewAge’s discretion.
  • Page 5: Tools Needed

    UV stable. The 304 stainless steel material used in the construction of NewAge Outdoor Kitchen Cabinets is highly rust resistant, however, chlorine in the air from swimming pools or the salt from sea air may cause surface rust to appear and even create some pitting corrosion if left on the product.
  • Page 6 Adjusting The Levelers Rotate Leveler counter clockwise Flip over Cabinet to reveal bottom to raise height Lower Height Raise Height Rotate Leveler clockwise to Flip over Cabinet to Check for Level lower height Raise Height Lower Height Repeat Steps 1-3 if required Level Cabinet.
  • Page 7: Installing Casters

    Installing Casters (Sold Separately) Remove 8 - M4 x 25 bolts in locations Remove Kick and store with hardware for future configuration considerations. with phillips screw driver accessed through holes in kick. Place caster plate over 4 rivet nuts in 4 corner locations install /tighten 16 x 1/4”...
  • Page 8: Installing The Drawer

    Installing the Drawer Inserting Drawer. Slide In Align Rails Removing Drawers. Right Side Left Side Slide Out...
  • Page 9 Note: Fastening Cabinets All drawers must be removed prior to fastening cabinets together. Remove plastic caps from cabinets. Parts Needed. 4 X Hex(M6) 4 X Hex Bolt (M6 x 50mm) Align bolts, tighten lightly. Level cabinets and tighten all bolts.
  • Page 10 Mounting the Worktop Stand cabinet upright. Place worktop over cabinets. Insert the worktop bolt heads Push worktop in to lock. into the keyhole shape slots. Optional: Repeat steps 1-5 for mounting Tighten screws to secure top. larger worktops.
  • Page 11 Wine Rack, Ice Tray and Garbage Bin Installation Open Doors. Set rack clips in the Set rack on top of 4 clips at the same desired slot locations on the level height. Store beverage bottles. upright posts. Remove and install beverage chilling Slide beverage chilling tray into/out of tray with formed metal edge.
  • Page 12: Adjusting The Door Hinges

    To adjust the gap between the doors and frame, turn the screw (B) clockwise or counterclockwise. Thank you for purchasing a NewAge Product! Please give us a call or visit online if you have any questions. Call 1.877.306.8930; for UK 0800.031.4069; e-mail at info@newageproducts.com...
  • Page 13 Care and Maintenance of your Aluminum and Glass Cabinets Perform Regular Maintenance Wash regularly with clean fresh water, mild detergent and a micro fi ber cloth. After washing rinse in clean water and wipe the surface dry with your cloth remembering to dry off glass and Aluminum surface.
  • Page 14 1.877.306.8930; au R.-U., composer le 0800.031.4069; ou envoyer un courriel à l’adresse info@newageproducts.com. ATTENTION : Est votre armoire ARRÊT endommagée? Avez vous besoin d’aide ou de pièces de rechange? Contactez NewAge Products a 1-877-306-8930; ou support@newageproducts. com. Ne pas retourner au détaillant. 65203-INSTL-01-Rev.05...
  • Page 15 Capacité Plans de travail de poids Plan de travail de 32 po — s’adapte sur une armoire lbs. Plan de travail de 56 po — s’adapte sur une armoire et le coin frigo lbs. Plan de travail de 64 po — s’adapte sur deux armoires Plan de travail de 88 po —...
  • Page 16: Pièces Fournies

    Déballage • Pour commencer, posez l’emballage sur une surface plane protégée. • Enlevez tous les matériaux d’emballage en carton et en mousse, ainsi que les sacs de plastique transparent. • Jetez ou recyclez tous les matériaux d’emballage. • Vérifi ez tout le contenu de la boîte et assemblez tous les outils requis. Voir les rubriques intitulées ”Pièces fournies “et “Outils requis “...
  • Page 17 Sous réserve des limitations et des exclusions énoncées ci-dessous ou dans la documentation d’un autre produit, NewAge garantit à l’acheteur initial que (1) les surfaces du produit seront exemptes de défaut pendant trois ans après la date d’achat, (2) les glissières de tiroir seront exemptes de défaut pendant deux ans après la date d’achat, et (3) l’intégrité...
  • Page 18: Outils Requis

    NewAge sont conçues pour résister aux intempéries et être stables aux UV. Le matériau d’acier inoxydable 304 qui est utilisé dans la fabrication des armoires de cuisine extérieure NewAge est très résistant à la rouille, mais le chlore de piscine qui est présent dans l’air ou le sel présent dans l’air marin peut faire rouiller la surface;...
  • Page 19 Nivellement de l’amoire Tournez dans le sens horaire pour Faites basculer pour accéder soulever le niveleur Lower Height Raise Height Faites basculer pour accéder Tournez dans le sens horaire pour otte et véri ez son niveau hauteur du niveleur. Raise Height Lower Height Répéter les étapes 1 à...
  • Page 20: Installation Des Roulettes

    Installation des roulettes (Vendu séparément) Retirez les boulons (8) - M4 x 25 dans les Enleve le coup de pied et mettre en stockage. endroits numérotés avec un tournevis Phillips accédé par les trous dans le coup de pied. Placez la plaque de roulette au-desssous 4 écrous de rivet au coins de l ’armoire et serrez Tournez l'armoire jusqu'à...
  • Page 21: Installation Des Tiroirs

    Installation des tiroirs Retrait des tiroirs Retirez le tiroir Alignez les coulisses Slide In Align Rails Insertion des tiroirs Côté droit Right Side Côté gauche Retirez le tiroir Left Side Slide Out...
  • Page 22 Remarque: Fixation des armoires Tous les tiroirs doivent être enlevés avant d’ armoires de Enlevez les bouchons en plastique Pièces requises 4 X écrous 4 X boulon à tête hex-agonaux hexagonale (M6) (M6 x 50mm) Alignez les boulons, puis serrez-les légèrement. Mettez les armoires de niveau, puis...
  • Page 23 Installation du plan de travail Posez le plan de travail sur Remettez l’armoire debout. les armoires. Insérez les têtes des boulons du Poussez sur le plan de travail de façon à le plan de travail dans les encoch- verrouiller en place. Répétez les étapes 2 à...
  • Page 24 Installation du porte-bouteilles, du bac à glace et des poubelles Ouvrir la porte. Poser les supports Poser le porte-bouteilles au sommet de du porte-bouteilles aux endroits dé- 4 supports installés à la même hauteur. sirés sur les montants verticaux. Ranger les bouteilles. Faire glisser le bac de refroidissement Retirer et installer le bac de refroid- sur le cadre amovible.
  • Page 25 Pour ajuster l’interstice entre les portes et le cadre, tourner la vis (B) dans le sens des aiguilles d’une montre ou dans le sens inverse des aiguilles d’une montre. Merci d’avoir acheté un produit NewAge! Veuillez nous appeler ou consulter notre site Web si vous avez la moindre question.
  • Page 26 Entretien et maintenance de votre aluminium et armoires en verre Entretien régulier Laver régulièrement avec de l’eau fraîche et propre , un détergent doux et un chiff on en microfi bres . Après lavage rinçage à l’eau propre et sécher la surface avec votre souvenir en tissu pour sécher le verre et la surface en aluminium .

Table of Contents