Handling And Storage; Handling Of The Packed Unit; Unit Inspection Upon Delivery; Inspect The Package - Xylem Bell & Gossett Autocirc e3-4 Series Installation, Operation And Maintenance Manual

Instant hot water recirculating systems
Table of Contents

Advertisement

2 Handling and Storage

2.1

Handling of the packed unit

WARNING:
Take appropriate measures during transport, installation and storage to prevent contamination
from external substances.
The Manufacturer delivers the unit and its components in a cardboard box.
2.2

Unit inspection upon delivery

2.2.1

Inspect the package

1. Check that quantity, descriptions and product codes match the order.
2. Check the packaging for any damage or missing components.
3. In case of immediately detectable damage or missing parts:
In both cases, promptly contact Xylem or the Authorized Distributor from whom the product was
purchased.
2.2.2

Unpacking and inspection of the unit

CAUTION: Cut and abrasion hazard
Always wear personal protective equipment.
1. Remove packing materials from the product. Dispose of all packing materials in accordance
2. Check the unit for integrity and to make sure that there are no missing components.
3. In case of damage or missing components, promptly contact Xylem or the Authorized
Content of the package
• Pump unit
• Union fitting for 1/2" copper pipe — 1- 18 UNSx 1/2" — 2 pcs.
• Fixing bracket
• Fixing screw — 5/32"x1 9/16" (4 x40 mm) — 2 pcs.
• Plastic anchor for wall mount — 1/4"x1 3/16" (6 x30 mm) — 2 pcs.
• Safety Instructions and Quick Startup Guide
Installation, Operation and Maintenance Manual
accept the goods with reserve, indicating any findings on the transport document, or
­
reject the goods, indicating the reason on the transport document.
­
with local regulations.
Distributor.
- _ _ /BU _ _ _ only)
(for models: e
3
- 4V/BA P _ C only)
3
(for models: e
- 4V/BA P _ C only)
(for models: e
3
- 4V/BA P _ C only)
3
(for models: e
en – Original Instructions
9

Advertisement

Table of Contents
loading

Table of Contents