ABB MNS-SG Operation And Maintenance Manual page 32

Low voltage metal-enclosed drawout switchgear
Table of Contents

Advertisement

To attach the lifting device:
1. Remove the carriage stop from one end of the lineup.
Carriage stop
Remove carriage stop
2. Loosen all rails for the overhead lift device and mount
the locator plates. Note that the plates have round
bosses that mate with holes in the rails.
3. Adjust the rails as required to loosely secure the locator
plates in place with the bosses in their mating holes.
Adjust the rails
32 MNS-SG Operation and Maintenance | Manual
4. After mating all locator plates in place with the rails, secure
the locator plates and the rails.
5. Position overhead lift device on the tines of forklift.
Raise the overhead lift device up to the rails on the frame.
Align wheels on the front rail and behind the rear rail. Adjust
the upper-rear wheel to minimize vertical movement.
Align wheels
Push the overhead lift device off the forklift onto the rails.
Raise lift device

Advertisement

Table of Contents
loading

Table of Contents