ABB Emax VF Installation And Service Instructions Manual

Low voltage air circuit-breakers
Table of Contents

Advertisement

Quick Links

Installation and
service instructions
1SDH000909R0001
B2342
Installation, service and maintenance
instructions for low voltage air
circuit-breakers
Emax VF

Advertisement

Table of Contents
loading

Summary of Contents for ABB Emax VF

  • Page 1 Installation, service and maintenance Installation and service instructions instructions for low voltage air circuit-breakers Emax VF 1SDH000909R0001 B2342...
  • Page 2 Dwg. Resp. Off. Title Language Installation, service and maintenance instructions for low voltage air Take over Off. App. circuit-breakers L6567 Model L5272 Scale Apparatus Emax L5712 B2204 ABB SACE Doc. no. 1SDH000909R0001...
  • Page 3: Table Of Contents

    Ekip T&P......47 8.4.9. Test with Ekip Connect (optional) ... 25 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 3/66...
  • Page 4 14.4. Notes ......58 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 4/66...
  • Page 5: Description

    50-60Hz Fig. 2 The SACE Emax VF circuit breakers can be used in applications with variable frequency from 1Hz to 60Hz, with rated voltage up to 1000V. The rated impulse withstand voltage of the circuit breakers is 8kV. The SACE Emax VF switch disconnectors up to 2500A are available also in LTT version; this special version, designed for low tem- perature environment, permits to extend the operating temperature range from -40°C to +70°C.
  • Page 6: Moving Part Construction Characteristics

    (on request) 7 Sliding contacts 8 Padlock for safety shutters (on request)) 9 Anti-racking-in lock for circuit-breakers of different size 10 Fixing holes (qty 4) Fig. 4 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 6/66...
  • Page 7: Checking On Receipt

    PR122/VF release, excluding the accessories. • The withdrawable version includes the moving part in the same conditions as above, and the fixed part with horizontal rear terminals. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 7/66...
  • Page 8: Installation

    Make sure that the anti-racking-in lock corresponding to the one installed on the fixed part is present on the circuit-breaker (moving part). - Anti-racking-in plate on the moving part (5). Example for E2N 16 according to the nameplate diagram E3N/VF E2N/VF Fig. 10 Fig. 9 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 8/66...
  • Page 9: Installation Of The Fixed Part (Fig. 12)

    Installation of the fixed part (Fig. 12) Attach the fixed part by means of the screws (1), washers (2) and nuts (3) (M8 x 16), supplied by ABB SACE. if other screws are used, make sure that the head of the screws does not extend more than 5.5 mm from the base of the fixed part.
  • Page 10: Electrical Connections

    2450 2400 2x(100x10) Fig. 16 Positioning the first anchoring baffle of the busbars according to the short-circuit current Anchoring to the switchgear HORIZONTAL VERTICAL HORIZONTAL VERTICAL Fig. 17 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 10/66...
  • Page 11: Assembly Procedure For The Connection Busbars

    The terminals are marked with alphanumerical identification codes as for the electrical circuit diagram. The terminal box is identified by code XV on the electrical circuit diagram. The terminal box is immediately accessible when the compartment door is open. Fig. 19 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 11/66...
  • Page 12: Withdrawable Circuit-Breaker

    Being of the two-way type (changeover contacts), the auxiliary contacts can be modified from break contacts to make contacts and vice versa simply by moving the output conductor from one position to the other, as shown in the figure. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 12/66...
  • Page 13 Signalling contacts disconnected - test isolated - connected To change the state of the position contact, proceed in the same way as explained for the auxiliary contacts. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 13/66...
  • Page 14: Putting Into Service

    1 Auxiliary power supply Open the CB. The graphic display turns on. Supply the trip unit at 24V DC. The word “ABB” scrolls in the bottom left- hand corner of the display. 2 Manual operating mechanism Carry out some opening and closing operations The spring loading lever moves correctly (see the chapter 7.2).
  • Page 15: Instructions For Use

    As an alternative to the transparent cover, a protection can be mounted on the manual closing and opening controls, which only allows operation of the pushbuttons by means of a special tool. Fig. 24 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 15/66...
  • Page 16: Circuit-Breaker Closing And Opening Procedures

    Opening having taken place is signaled by the letter “O” appearing in the indicator (3). Press Fig. 27 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 16/66...
  • Page 17: Racking-In/Out Operation

    (D) of the fixed part. Remove the lifting devices. Push the moving part as far as the stop in the fixed part. Close the compartment door. Fig. 29 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 17/66...
  • Page 18 Passing from the CONNECTED position, to the TEST ISOLATED position, to the DISCONNECTED position - Repeat the connection procedures changing the direction for turning the crank handle to anti-clockwise. Open the door in the disconnected position. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 18/66...
  • Page 19: Maintenance

    WARNING ELECTRICAL SHOCK HAZARD: Shock Hazard or Injury. ABB declines all responsibility for damage to things and injury to people due to failure to comply with the instructions contained in this document. Maintenance tasks must be performed by qualified staff with a detailed knowledge of the unit.
  • Page 20: Circuit-Breaker Connections And Connections Between The Circuit-Breaker And The Control Panel

    - Remove the front cap (3) by loosening the four screws (4). Fig. 33 - If there is an undervoltage release, remove the coils support and release the control springs, closing and opening the circuit-breaker. 12 2/ Fig. 34 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 20/66...
  • Page 21: Mechanical Control

    User Data and/or Tag Name area. These data will be stored inside the relay. - Remove the Ekip T&P cable adapter from the relay. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 21/66...
  • Page 22: Maintenance Operations; Final Checks

    - Check that there are no foreign bodies in the circuit-breaker cabinet - Check that the fixing screws are tightened on the fixed side to the control panel (M8 - 25Nm). B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 22/66...
  • Page 23: Connections Between The Circuit-Breaker And The Control Panel

    - Remove the flange (1) of the release, turning the screws (2) as shown in the figures - Remove the front escutcheon plate (3) by removing the four screws (4) - Remove the arcing chambers (5) by removing the screws (6). Fig. 41 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 23/66...
  • Page 24: Mechanical Control

    - Check that the opening and closing shafts are free to rotate. Fig. 43 - In the case of deformed or oxidated springs, missing rings or serious wear to the controls contact ABB Sace (*). - (*) Subject to the customer’s approval, ABB can replace “A” type parts.
  • Page 25: Checking Contact Wear

    4) Visually check that the main plates and the blowout magnets are in place. 5) Check for oxidation or beads and if they are detected, request help from the qualified ABB technician (*). 6.1) Check the blowout magnets distances (distance A fig 45).
  • Page 26: Maintenance Operations; Final Checks

    Check correct operation of the inserted and extracted circuit-breakers lock devices (if present). B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 26/66...
  • Page 27: Measures To Be Taken For Any Operating Anomalies

    Damaged coil Replace the coil Operate by hand. If the fault persists please • • Operating mechanism blocked contact ABB SACE • • Key locked in open position Unlock by inserting the key Circuit-breaker in intermediate position • • Complete the insertion operation...
  • Page 28: Accessories

    When it is not supplied, circuit-breaker closing is prevented. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 28/66...
  • Page 29 (gold plated contacts) for a rated voltage under 24 V (digital signal). In max In max cosφ 125 V DC 0,3 A 10 ms 250 V AC 250 V DC 0,15 A 10 ms B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 29/66...
  • Page 30: Mechanical Locks

    The circuit-breakers can be installed vertically or horizontally. 4 types of interlocks are available: type A: between 2 circuit-breakers (power supply + emergency) B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 30/66...
  • Page 31: Notes For Emax Ltt Low Temperature Accessories

    - the auxiliary contacts For the change over, the customer can use a suitable electronic relay, whose diagram is supplied by ABB SACE. The mechanical interlocks between two or three circuit-breakers are made by means of cables that can be used for circuit-breakers installed, either side-by-side or one over the other.
  • Page 32: Protection Releases - General Notes

    WARNING: Dielectric stiffness tests must not be performed on releases, inputs or outputs. To perform impulse insulation tests (e.g. 8 Kv) on the main circuits of an Emax VF circuit-breaker, first disconnect the PR122/VF-specific connectors XK10, XK11 and XK12, by removing the actual relay as indicated in figure 21 on page 12 of this manual.
  • Page 33: Abbreviations And Notes

    Auxiliary power supply 11.2.2. Notes A. Use the “Belden 3105A”- type two-wire cable for instance (not supplied by ABB SACE). B. Use the “Belden 3106A”- type three-wire cable for instance (not supplied by ABB SACE). C. The unit has a “backup-protection” function; if the first command to the opening solenoid does not open immediately the circuit- breaker (TC partially fault), TRIP commands are repeatedly sent until the circuit-breaker opens (providing a Vaux is present) or the current disappears (if self-power supplied).
  • Page 34: Sace Pr122/Vf Release - Identification

    The PR122/VF is a high-performance protection unit offering Protection, Measurement, Data storage, Communication (optional), Self-test and Load control functions for ABB SACE ‘Emax’ low-voltage air circuit-breakers, for application at variable frequency. The PR122/VF unit installed on CB is connected to current sensor resistor for reading of primary current signals, and to Trip Coil for the management of CB Opening commands.
  • Page 35: Power Supply Specifications

    Protection L Timing Alarm on one or more of: Contact Wear, Temperature Error on one or more of: Rating Plug, Key Plug, Trip Coil ON (Fixed) Internal Error (necessary assistance of ABB) WARNING Yellow No Alarm or CB Error ON (Blink @0.5Hz)
  • Page 36: Display

    12.2.2.2. CB and Trip Unit Error The error messages regarding the trip unit and CB are shown on the bottom-left corner of the display. Every message, except for the ABB logo, is shown with an ICON representing the warning level ICON...
  • Page 37: Working Icon

    The PR030/B unit is a battery unit useful to supply the PR122/VF unit, and for Trip test from display. • Units BT030-USB and Ekip T&P allow the user to supply and communicate with PR122/VF, using ABB Software Ekip Connect. More details starting from para12.4.
  • Page 38: Main Area

    The CB remains close. L Alarm: (1.05...1.3) I < I < I The CB will open for L protection. I Alarm: I > I The CB will open for I protection. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 38/66...
  • Page 39: L Protection

    Activation of Start-Up module PR120/D-M ,or the external unit BT030-USB or Ekip T&P with ABB Software Ekip Connect . A new start is possible after the current has dropped below this threshold. WARNING: On the display menu, the I protection settings (threshold and Startup parameters) are available to user only with protection enabled.
  • Page 40: Load Protection

    Parameters I3 Startup threshold and time are not reported on the table: they do not influence Trip timing, but only the usage interval of another threshold For others functions: Threshold Protections Setting Tolerance LC1, LC2 50% I1...100% I1 ± 10% Fixed by ABB: Activation whitin range 10ms...40ms 0.3In...10In ± 10% B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc.
  • Page 41: Curves

    By choosing Events from the Historical menu, the last one recorded will be shown. To view the other trip details, use the UP and DOWN push buttons. B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 41/66...
  • Page 42: Measurements

    All the trip tolerances detailed in para.12.3.3.5, and measurement tolerances detailed in para. 12.3.4.3, refer to the guaranty that the nominal frequency is within the working range 0.2...1.25 of value set. WARNING: The CB installation operation is not available to the user, only to ABB personnel. 12.3.5.2. HW trip In this section it is possible to activate/deactivate the HW trip function.
  • Page 43: Modules

    8,E,1 / 8,O,1 / 8,N,2 / 8,N,1 Set the kind of byte for communication (N°bit, Parity, stop bit). Addressing Modbus standard / ABB Set the address for communication. SIGNALLING Relay n.1 - Allow selection of events to associate with each contact.
  • Page 44: Measure Store Time

    WARNING: To perform Test of YO and YC command, CB must be in position= Inserted. PR122/VF does not give the result of the tests, but only sends a command (the user must to check the action of the CB). B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 44/66...
  • Page 45: Signalling Module

    - Energy reset: when the input is active for the specified delay, the energy meters are reset. Through the “Delay” parameter, you can specify the time to elapse before the input is enabled within the range 0s...100s (step 0.01s). B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 45/66...
  • Page 46: Output Contact

    The PR030/B unit is provided with trip unit with a 9V battery inside. WARNING: Before putting the CB into service, ABB suggests checking the presence of errors on PR122/VF with PR030/B battery unit and the performance of a Trip Coil test.
  • Page 47: Ekip T&P

    Ekip Connect is distributed on CD, or is available to download from the internet at the address http://bol.it.abb.com in the section “ Work Tools - Circuit breakers software download area”.
  • Page 48: Default Settings

    12.5. Default Settings The PR122/VF is supplied by ABB SACE with the following predefined parameters: Protection/function Status Default Settings ON (not disabled) 1 In; 102 s 4 In I Startup 4 In; 100 ms Trip Enable= DISABLE 50% I 75% I...
  • Page 49: Troubleshooting

    WARNING: Before consulting the following table, check for any error messages appearing for some seconds on the display. For FN will be indicated the correct functioning of the PR122/VF. If the suggested action does not lead to a solution of the problem, please contact the ABB SACE assistance service. Situation...
  • Page 50: Overall Dimensions

    3 Circuit-breaker M10 fixing drilling (use M10 screws) 4 N° 1 M12 screw (E2, E3) for earthing (included in the supply) 5 Insulating or metal-insulated wall 117,5 117,5 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 50/66...
  • Page 51 Fixed circuit-breaker Basic version with vertical rear terminals View A View A Captive M12 included in the supply Fig. 36a B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 51/66...
  • Page 52 Tightening torque of the main terminals: Nm 70 Holes for passing through flexible cables Tightening torque of the earthing screw: Nm 70 for mechanical interlocks High resistance M12 screw Quantity for terminal PHASE Fig. 39 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 52/66...
  • Page 53 5 Run from connected for a TEST to isolated 6 Alternative drilling with 25mm pitch for fixing fixed part 7 Ventilation drilling on the switchgear Fig. 40 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 53/66...
  • Page 54 Withdrawable circuit-breaker Basic version with vertical rear terminals View A View A Captive M12 included in the supply Fig. 42 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 54/66...
  • Page 55 Tightening torque of the main terminals: 70 Nm for mechanical interlocks Tightening torque of the earthing screw: 70 Nm High resistance M12 screw Quanty per terminal PHASE Fig. 46 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 55/66...
  • Page 56 Compartment door mechanical lock Door drilling Minimum distance between the circuit-breaker and the switchgear wall Fixed version Withdrawable version Fig. 47 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 56/66...
  • Page 57: Circuit Diagrams

    XK2 - XK3 = Connectors for auxiliary circuits of PR122/VF releases XK10 - XK12 = Connectors for power circuit of PR122/VF releases = Connector to signal open/close = Connector for YO1 B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 57/66...
  • Page 58: Description Of Figures

    This m ay be achieved using an external circuit comprising a permanent make contact, the contact shown in fig. 12 and a time-delay relay. E) For connecting the EIA RS485 serial line, see “Technical Application papers – QT 9” communication via BUS with the ABB switches.
  • Page 59 (i.e., 3 conductors shown) Conductors or stranded Make position contact (limit Fuse (general symbol) cables (i.e., 3 conductors contact) shown) Connection of conductors Break position contact (limit Current sensor contact) B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 59/66...
  • Page 60 Circuit diagram - Operating status Three-pole circuit-breaker with PR122/VF electronic release > XK10 >> > XK12 XK11 PR122/VF B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 60/66...
  • Page 61 Motor operating mechanism, opening, closing and undervoltage releases Signalling contacts B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 61/66...
  • Page 62 Signalling contacts B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 62/66...
  • Page 63 Auxiliary circuits of the PR122/VF release Warning: see note F PR122/V F W2 (L OCAL BUS) PR120/D-M communication module PR122/VF W1 (SYSTEM BUS) B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. No Page No 63/66...
  • Page 64 PR120/K signalling module PR122/VF PR122/VF B2342 Model Scale Apparatus Emax VF 1SDH000909R0001 Doc. no. Page No 64/66...
  • Page 66 Due to possible developments of standards as well as of materials, the characteristics and dimensions specified in the present catalogue may only be considered binding after confirmation by ABB SACE. ABB S.p.A. Via Pescaria, 5 24123 Bergamo - Italy Tel.: +39 035.395.111...

This manual is also suitable for:

L5272L5712L6567B2204B2342

Table of Contents