Install Ductwork; Measure The Installation - Broan ESB10 Installation Instructions & Use And Care

Broan-nutone esb10 hoods: install guide
Table of Contents

Advertisement

Available languages

Available languages

1. INSTALL DUCTWORK

Plan where and how the ductwork will be installed.
Install proper-sized ductwork, elbow(s) and roof or wall cap for the type of blower you are installing. If using 6'' (150 mm) round
ducts, use a transition. Use 2'' (50 mm) duct tape to seal duct joints.
Wall cap
HH0011A

2. MEASURE THE INSTALLATION

Dimensions for the most common installations are shown below.
We recommend to install the hood at a minimum of 20" (508 mm) from an electric range and at 24" (610 mm) from a
gas range.
For optimal performance, the hood should not be installed more than 30" (762 mm) from cooktop.
Cabinets
HH0013A
Roof cap
3¼" x 10" duct
Hood
Hood
20" minimum
clearance
(24" for gas)
Standard
36" height
cooktop
Roof cap
Wall cap
HH0014A
Cabinets
Hood
HH0012A
- 4 -
6" round duct
3¼" x 10" to 6"
round transition
Hood
30" maximum
clearance
Standard
36" height
cooktop

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esv10Esc270Esn10Qde30Qde

Table of Contents