GE Zoneline AZ95E Owner's Manual And Installation Instructions page 19

Vertical air conditioner
Hide thumbs Also See for Zoneline AZ95E:
Table of Contents

Advertisement

Available languages

Available languages

Installing the Zoneline
4. Complete Condensate Drain
Connections
An external or an internal drain must be attached to
the primary drain connector. A secondary drain is
supplied if required by state and local codes. Refer
to the local codes for proper installation of the drains.
If the secondary drain is not used, seal its drain port
with a 3/4" FNPT plug.
Drain Overview
Secondary Drain
If not used, seal with
plug.
Primary Drain
Internal Drain (Primary)
Run condensate line to
building interior drain
line with proper venting
according to local
building codes.
49-5000561 Rev. 1
Drain line connection
to right of platform
4. Complete Condensate Drain
Connections (cont)
External Drain (Secondary)
If necessary, extend
secondary drain line though
the plenum and grille.
Use a pipe connector and
additional piping to ensure
drain pipe extends past the
outdoor grille.
Primary
Drain
Refer to drain platform instruction
manual for drain installation
5. Install Unit to Plenum
Align the unit with plenum opening and slide unit
toward plenum to ensure it is seated properly with the
drain platform.
Wall
Plenum
Drain
Platform
Extend secondary
drain pipe into plenum
or through outdoor
grille. Grille must be
modified to allow drain
line to pass through.
Unit
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline az95h

Table of Contents