Channel #3 Calibration Process - Waste Water - Pacific Sun Kore 7th User Manual

Ultimate dosing station
Hide thumbs Also See for Kore 7th:
Table of Contents

Advertisement

Kore 7th Manual / kHLab Edition
6.3. Channel #3 Calibration Process -
Channel #3 is dedicated to
the steps below. Refer to the following pictures.
Step 3 - Fill Tube #3
Step 4 - Calibration Channel #3
Checking
Waste
Waste Water
(Channel #3) Accuracy
Waste Water
Water. To calibrate pump#3 in this channel follow
Page 24

Advertisement

Table of Contents
loading

Table of Contents