Installation; Dimensions; Installation Requirements; Electrical Supply - S&P CONTROL ECOWATT BASIC Manual

Hide thumbs Also See for CONTROL ECOWATT BASIC:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11

3. INSTALLATION

3.1. DIMENSIONS (mm)

3.2. INSTALLATION REQUIREMENTS

The control box should be installed in all cases with the gland at the bo-
ttom. Any other position will compromise the IP envelope. Cable glands
that are not used must be tightened clockwise until opening is closed.

3.3. ELECTRICAL SUPPLY

Supply (J3):
Class:
230V input/output (J9):
+24Vdc output (J10):
14
230V 50Hz
II
3A
200mA

Advertisement

Table of Contents
loading

Table of Contents