Putting Into Operation - Intec 22201 Operating And Maintenance Manual

Air-hydraulic
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 10
EN

PUTTING INTO OPERATION

ASSEMBLY
1. Take the handle, the jack and the extensions out of the cardboard box.
2. The handle is divided into three parts. Prior to use, assemble as shown in the drawing using the dowel and spanner
supplied. DWG. 10
CONNECTION TO THE COMPRESSED AIR SYSTEM
- Compressed air enters into the jack circuit through the quick coupling on the top of the manual lifting/descending controls;
it is therefore necessary to have a connecting pipe with a quick coupling compatible with that of the jack. Check that the air
supply pipe has a useful passage of at least 6 mm and it is not pinched or restricted anywhere. DWG. 11
WORKING AIR PRESSURE: 8 - 10 BAR
- Absolutely never put the following into the compressed air circuit: hydraulic or Vaseline oil, brake liquid, kerosene or other
liquids.
-Install a filter dehumidifier-lubricator unit in the compressed air system.
- If you want to lubricate the compressed air circuit use exclusively:
AGIP OSO 100; MOBIL DTE 27; ESSO TERESSO 100;
SHELL TELLUS 100; BP ENERGOL HP 100
ACCESSORIES
The jack is supplied with two extensions or height adapters (60mm extensions), and a circular tooth plate (16mm plate).
Never use more than two extensions!
consequence of disregard for the above indications and the warranty conditions are invalidated thereof!
SCRAPPING AND DISPOSAL
- The lubricants must be disposed of in compliance with the anti-pollution laws in force.
- Scrapping the jack and its component parts must be carried out by the user in accordance with current laws.
The manufacturer is not liable for any damage resulting as a
13

Advertisement

Table of Contents
loading

Table of Contents