Download Print this page

Hitachi E590 Installation Manual page 4

Virtual storage platform
Hide thumbs Also See for E590:

Advertisement

The following instructions describe how to install the controller into a Hitachi Universal
V2B rack. For information about installing the controller in a third-party rack, see the
documentation for that rack.
Note: The rail kit comes with pins that will fit racks with square or circular
shaped holes. Please use the correct pin type for your rack.
Number
1
2
Before you begin
Make sure the rack is secure and cannot fall over.
Make sure the rack has one or more PDUs installed.
Verify that all power cables are removed from the AC power receptacles on the rear of
the controller.
Install the rack stabilizers before mounting the storage system in the rack.
Procedure
1. Attach stopper with three screws on the rear side of the rail. Repeat step for both
rails.
Installing your VSP E590 and VSP E790 storage system
Hitachi Virtual Storage System E590, E790 Installation Guide
Pin for square holes
Pin for round holes
Step 2: Install the storage system into a rack
Item
4

Advertisement

loading

This manual is also suitable for:

E790