Download Print this page

Happy Trails HTP1-8-30 Quick Start Manual page 2

Light bracket for bmw f650(twin)/700/800gs

Advertisement

Step 4
Tighten the bolt to 18 ft/lbs with the light tab facing
downward as shown. We recommend placing the lower
hole which is to be used at the front of the mount. The
larger hole is for 10mm studs on PIAA lights, while the
smaller hole should work for the 8mm studs on lights
from other manufacturers.
Step 5
Mounting hardware has been included for lights that
do not come equipped with their own mounting hard-
ware. To install the auxiliary light, place the bolt into
the mounting hole in the light then through the appro-
priately sized mounting hole then tighten the included
Nylock nut into place.
Recommended Tools:
6mm Allen Wrench
Fig 4
Fig 5
Hardware List:
2 - M860S bolts
2 - M850S bolts
2 - M8 Lock Washers
2 - M820C bolts
2 - M8N nuts
4 - 8mm Flat Washers
4/4/13
Rev. 2
HH

Advertisement

loading