Chapter 2. Setup And Operation; Preliminary Setup - GE MG-101 User Manual

Field moisture calibration system
Table of Contents

Advertisement

Chapter 2. Setup and Operation

2.1 Preliminary Setup

IMPORTANT: Be sure you read and understand "Initial Considerations" on page 3 before proceeding.
To prepare the MG-101 for operation, complete the following steps:
1. Remove the back panel by removing the two small screws at the bottom (see Figure 2 below).
2. Fill the supplied plastic squeeze bottle with distilled (not deionized) water and connect it to the fill tubing at the
bottom of the saturator bottle (see Figure 2 below). This length of plastic tubing should be left permanently
attached to the fitting at the bottom of the saturator bottle.
Saturator Bottle
Fill Mark
Fill Tubing
Petcock
Screws (2)
MG-101 User's Manual
Figure 2: MG-101 Rear View with Panel Removed
Chapter 2. Setup and Operation
5

Advertisement

Table of Contents
loading

Table of Contents