Ensure that packing cases are not placed on wet surfaces / waterlogged areas.
-
Reclosers should not be stacked one over the other.
-
Reclosers should be lifted by a lifting device equipped with forks or slings. If a crane is used, slings
-
shall be used. The units must not be rolled or dropped.
3
R
ECEIPT AND
R
R
ECEIPT OF
ECLOSER
Each recloser is assembled and tested at the factory. Prior to shipment, the equipment is thoroughly
inspected to ensure a quality product free from defects. If damage is noticed, call the carrier at once for
inspection, and request an inspection report. Afterwards, file a formal claim with the carrier, supported
with the Airway/Roadway Bill.
Each delivery, on receipt, should be checked for,
Shortages and discrepancies. (Check against order and delivery documents).
-
Any transit damage and material losses.
-
Abnormality, if any, must be notified immediately to ABB, forwarding agents and the insurance
-
company.
Instructions and literature packed with the recloser should be kept with the unit. Additional copies may
be obtained upon request from the local ABB sales office. Following are the typical parts in which
recloser are generally shipped from factory.
11 |
P a g e
Figure-2 : Packing case lifting arrangement
S
TORAGE PRIOR TO INSTALLATION
Instruction Manual for HV Unit of OVR-15, 27 & 38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ovr-27Ovr-38

Table of Contents