Second Line Maintenance - Siemens Stratos Outstation Installation Manual

For ip router proroute h685 4g
Table of Contents

Advertisement

Maintenance

4.4. Second Line Maintenance

The faulty parts being returned must always be sent back in the original packaging if availa-
ble or in an approved Anti-Static packaging, along with a fully completed Fault Label to the
following address:
Logistics Spares Returns Centre
Siemens Mobility
Traffic Solutions
Coalfield Way
Ashby Park
Ashby de la Zouch
LE65 1JD
For UK users, any queries should be directed to the Service Logistics Manager on:
(01530) 258181
IP ROUTERS INSTALLATION GUIDE 3G OTU
667/CI/45025/000 Rev 4 Unrestricted
22

Advertisement

Table of Contents
loading

Table of Contents