7. Fitting the pipe into the valve
Fit the coupling head of the pipe into the valve to
the fullest extent and ensure that the installation
depth marking matches up.
www.vexve.com
8. Check before pressing
Before pressing, check that the O-ring groove
on the valve meets the groove on the tool.
9. Pressing the connection
Press the connection using a standard-compli-
ant M or V profile press tool intended for press-
ing thin-walled steel pipes.
10. Removing the collar
Remove the cracked collar by hand if it does not
detach of its own accord.